Plant overview

Priority 1 · F004SWRO-HP-P02·Zone B3 • High-Pressure Pump Bay·Reported 12s ago

SWRO HP-Pump 02 — Drive-End Bearing Inner Race Spalling (SKF 6319-C3) & 0.08mm Shaft Misalignment

VT-204B: 7.8 mm/s RMS (Trip > 7.1)PDT-202: 3.8 barTT-204B: 78.6 °CRef: Grundfos Manual Vol. 4 §7.3

SWRO Train A — Process Subsystems

4 Normal 1 Warning 1 Critical
Stage 01 · 91%

Dual Media Pre-Filter

SWRO-PF-01

ΔP0.42 bar
SDI₁₅2.3
Flow1,930 m³/h
Stage 02A · 94%

HP-Pump 01 (Train A1)

SWRO-HP-P01

Discharge63.8 bar
Vibration1.4 mm/s
Bearing RTD54.2 °C
Stage 02B · 67%

HP-Pump 02 (Train A2)

SWRO-HP-P02

Vibration7.8 mm/s
Diff. press3.8 bar
Bearing RTD78.6 °C
Stage 03 · 96%

PX-Q300 Isobaric ERD

SWRO-ERD-01

Transfer eff.97.2%
Acoustic1.1 mm/s
HP brine62.1 bar
Stage 04 · 82%

RO Vessel Rack (Stg 1–2)

SWRO-MEM-02

Conductivity585 µS/cm
Stage 2 ΔP2.9 bar
Recovery44.5%
Stage 05 · 98%

Co-Gen GT-01 & Product

PWR-GT-01

Load42.5 MW
Vibration1.6 mm/s
Permeate860 m³/h

Active work order queue

WOTaskAssigneePriorityAction
W102

Inspect HP-Pump 02 Bearings & Laser Shaft Alignment

SWRO HP-Pump 02

critical
W101

SWRO Stage 1 & 2 Membrane CIP Wash Cycle

Stage 2 Membranes

medium
W100

Calibrate RO Permeate Flow Meter FT-401

Pre-Filter 01

low
W099

HPP-01 Post-Overhaul Vibration Baseline Recording

SWRO HP-Pump 01

high
W098

11kV VFD Panel SWG-02B Harmonic Filter Inspection

SWRO HP-Pump 02

high
SAP PM synchronized · 2 LOTO permits activeLog field reading

Shift A maintenance personnel

3 available
NP

Nuwan Perera

Senior Mechanical Fitter

KS

Kasun Silva

SCADA & Instrumentation Specialist

CB

Chaminda Bandara

Senior Industrial Electrician

TF

Tharaka Fernando

RO Membrane & Process Specialist

RK

Ruwan Kumara

Instrument & Calibration Technician

Recent plant events

Historian
VT-204BCRITICAL ALARM: HP-Pump 02 vibration reached 7.8 mm/s RMS (3x harmonic peak)
AI-RCACognitive RCA generated — 89% probability Drive-End Bearing SKF 6319-C3 wear
WO-102Work Order #W102 assigned to Nuwan Perera (LOTO-HP02-11KV active)
CT-412Stage 2 RO Permeate Conductivity drift detected (585 µS/cm on PV-204)